M/T Assembly Installation

  1. Wipe off any grease contamination from the ball joint tapered section and the threads. Reconnect the tie-rod ends (A) to the steering knuckles. Install the 12 mm nut (B) and tighten it.
  1. Install the new cotter pin (C) and bend it as shown.
  1. Refill the transmission fluid.
  1. Lower the vehicle on a lift.