Engine Installation

  1. Install the under-floor three way catalytic converter (under-floor TWC) (A). Use new gaskets (B) and new self-locking nuts (C).
  1. Connect the secondary heated oxygen sensor (secondary HO2S) connector (D).
  1. With A/C: Install the drive belt.