Cylinder Head Installation

  1. After torquing, if using the used cylinder head bolt, tighten all cylinder head bolts in three steps (90 ° per step). If using a new cylinder head bolt, tighten at 110 ° on the first step, at 100 ° on the second and third steps.
    NOTE: Remove the cylinder head bolt if you tightened it beyond the specified angle, and go back to Step 9 of the procedure. Do not loosen it back to the specified angle.
  1. Tighten the two 6 mm bolts securing the cylinder head.
  1. Bleed the air from the hydraulic tappet.

Used Bolt
New Bolt