-
Tighten the new transmission mounting bolt and nuts (A).
-
Install the ground cable (B).
-
Make sure the hoist brackets are positioned properly. Raise the hoist to full height.
-
Support the front subframe with the wood piece and a jack, and lift it up to the body.
|
|